Industrial and Warehouses The construction of approximately 18,000 sf is an addition to the existing Ingot Facility at the ArcelorMittal Steelton Plant. The new addition is structural steel framed, 99' high to the roof line - equivalent to the height of a 7-story building, with metal roof and wall panels. The structure is supported by 212 concrete-filled steel pipe micropiles under cast-in-place concrete pile caps. A 20" thick reinforced concrete slab-on-grade provides the working surface for the steelmaking operations in the new addition.
|