Healthcare and CCRC Renovation of existing clinical space on the second floor, adjacent to 18 existing operating rooms and directly above Wellspan’s central laboratory, which oper¬ates 24 hours per day. The project entailed complete demolition of masonry, construction of new floor plans, and replacement of mechanical systems. The main component of the project was creation of a new Vascular Catheterization Lab featuring Phillips C-Arm Imaging equipment and Skytron Procedure Lighting. A central nurse’s station enables line-of-sight contact with 12 prep-recovery rooms and features a patient tracking system that provides vital information to both staff and families. The addition of a new 19th operating room, located between the Vascular Lab and the existing OR suite, serves as a hybrid operating/procedure room and is now the hospital’s largest OR.
|